DELEEMA · INDUSTRIAL FLUID TRANSFERservice@chinadeleema.com
DELEEMA / AODD SELECTION GUIDE

AODD Pump Selection Guide: Flow, Pressure & Materials

A complete AODD enquiry connects the process fluid to the actual operating point and installation. Use this checklist before comparing model sizes.

01

1. Define the fluid

Record composition, concentration, temperature, viscosity, density, maximum particle size, solids loading, abrasiveness and whether the fluid can settle, cure or crystallise.

02

2. Define the operating point

State required flow at the expected discharge pressure, suction lift or inlet pressure, line length, elevation, operating schedule and available air supply.

03

3. Confirm materials and installation

Review all wetted materials, connection standard, port orientation, grounding, cleaning method, ambient conditions and maintenance access.

Get a recommendation for the real duty

Select an AODD pump using fluid composition, viscosity, solids, temperature, required flow, pressure, suction and wetted-material compatibility.

Email enquiryWhatsApp

Email and WhatsApp include the current source page; you still review and send the message.